On 16 January 2024, Japan's Ministry of Land, Infrastructure, Transport and Tourism issued a corrective order concerning Daihatsu's certification procedures and took action concerning specific vehicle types. The company later reported progress on preventive measures. Each approval and corrective measure retains its own status.
In a fictional manufacturer's application, the tested configuration differs from the proposed production specification. A reviewer who did not prepare the application compares configuration, results, approval and submission.
What is gathered
In a fictional manufacturer's application, the tested configuration differs from the proposed production specification. The certification team supplies the test plan, instrument records, component list and application versions through an authorised repository. An:des prepares a comparison by test and configuration.
Who reviews and what Érika prepares
Érika alerts the certification manager: “Application T-42 contains a specification that does not match the test record. Review the technical explanation and proposed retest before submission.” The manager assigns the engineers and independent reviewer, sets the response date and approves the request.
The decision
The engineering authority determines which tests are required. After reviewing the results, the person holding authority to approve the application selects the exact version for submission. The delegation, technical conclusions and remaining conditions accompany the decision.
The execution
The testing team performs and records the authorised work. The designated applicant submits the approved version through the authority's required channel and returns the document, submission reference and receipt.
The verification
A reviewer who did not prepare the application compares configuration, results, approval and submission. If a component or version differs, the manager receives a new action. The authority's receipt and its eventual approval are recorded separately.
What changes afterwards
The next application includes the corrected configuration check and a sample of source records. The decision changes the evidence used for certification and establishes exactly what was submitted.
Sources and documents
Official and press sources, each with its date. The scene uses a fictional organisation and does not describe real An:des work for the company named. The schematic illustration is not a photograph of the event.
- MLIT · 2024-01-16 →
- Daihatsu · 2024-01-26 →
- Daihatsu · 2025-01-24 →
TV Asahi / ANN · 2024-01-16
TV Asahi / ANN · 2024-01-16
TV Asahi / ANN · 2024-01-16 →TBS NEWS DIG / Bloomberg · 2024-02-09
TBS NEWS DIG / Bloomberg · 2024-02-09
TBS NEWS DIG / Bloomberg · 2024-02-09 →Car Care Plus · 2025-01-27
Car Care Plus · 2025-01-27
Car Care Plus · 2025-01-27 →